Third Supplementary Prospectus
Released
Released
Announcement PDF
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
1
EASTERN GAS CORPORATION LIMITED
ACN 692 331 838
THIRD SUPPLEMENTARY PROSPECTUS
IMPORTANT INFORMATION
This is a third supplementary prospectus (Third Supplementary Prospectus) which supplements the
replacement prospectus dated 12 December 2025 (which replaced the original prospectus
dated 5 December 2025) and the first supplementary prospectus dated 16 January 2026 and the
second supplementary prospectus dated 23 January 2026 (together, the Prospectus) issued by
Eastern Gas Corporation Limited (ACN 692 331 838) (Company).
This Supplementary Prospectus is dated 6 February 2026 and was lodged with the ASIC on that date.
The ASIC, the ASX and their respective officers take no responsibility for the contents of this Third
Supplementary Prospectus.
This Third Supplementary Prospectus should be read together with the Prospectus. Other than as set
out below, all details in relation to the Prospectus remain unchanged. Terms and abbreviations
defined in the Prospectus have the same meaning in this Third Supplementary Prospectus. If there is
a conflict between the Prospectus and this Third Supplementary Prospectus, this Third
Supplementary Prospectus will prevail.
This Third Supplementary Prospectus will be issued with the Prospectus as an electronic prospectus,
copies of which can be downloaded from the website of the Company at
www.easterngas.com.au.
This is an important document and should be read in its entirety. If you do not understand it, you
should consult your professional advisers without delay.
1. PURPOSE OF THIS DOCUMENT
This Third Supplementary Prospectus has been prepared to advise investors of various
amendments to the Prospectus, including the provision of an updated financial
information section of the Prospectus and inclusion of a new Investigating Accountant’s
Report, prepared by Pitcher Partners Sydney Corporate Finance Pty Ltd (Pitcher Partners).
2. AMENDMENTS TO THE PROSPECTUS
2.1 Financial Information and Investigating Accountant’s Report
The Company has engaged Pitcher Partners to prepare an Investigating Accountant’s
Report on the pro forma financial information of the Company as at 31 October 2025 to
replace the original Investigating Accountant’s Report included in the Prospectus which
was prepared by A D Danieli Audit.
Accordingly, the Prospectus is amended by:
(a) deleting all references to “A D Danieli Audit”, and replacing these with reference
to “Pitcher Partners”;
(b) deleting references to “A D Danieli Audit Pty Ltd (ABN 56 136 616 610)” from the
Glossary in Section 12, and replacing it with reference to “Pitcher Partners Sydney
Corporate Finance Pty Ltd (ABN 77 122 561 184)”;
(c) deleting the address of A D Danieli Audit from the Corporate Directory, being
Level 1, 261 George Street SYDNEY NSW 2000 and replacing it with the address of
Pitcher Partners, being Level 16, Tower 2 Darling Park 201 Sussex Street Sydney
NSW 2000;
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
2
(d) deleting Section 6 (Financial Information) and replacing it with the Section 6
included as Annexure 1 in this Third Supplementary Prospectus;
(e) deleting the fees payable to A D Danieli Audit in Section 10.7 of $15,000
(excluding GST) and replacing this with the fees payable to Pitcher Partners of
$30,000 (excluding GST);
(f) amending Section 10.7 by the addition of the following disclosure after the last
paragraph “A D Danieli Audit Pty Ltd prepared the Investigating Accountant’s
Report which was included in Annexure C of the replacement prospectus dated
12 December 2025. The Company previously agreed to pay A D Danieli Audit a
total of $15,000 (excluding GST) for these services. During the 24 months
preceding lodgement of this Prospectus with the ASIC, A D Danieli Audit has not
received any fees from the Company”; and
(g) deleting the Investigating Accountant’s Report from Annexure C and replacing
it with the Investigating Accountant’s Report included as Annexure C in this Third
Supplementary Prospectus.
Pitcher Partners has given its written consent to being named as Investigating Accountant
in this Third Supplementary Prospectus and to the inclusion of the Investigating
Accountant’s Report in Annexure C in the form and context in which the information and
report is included.
2.2 Acquisition Agreement
The Company and Pure have entered into an agreement to:
(a) acknowledge that 62,500,000 Shares have been issued to Pure as consideration
for the Acquisition (including 1 Share issued to Pure on incorporation of the
Company);
(b) reduce the number of Performance Rights held by Pure from 10,000,000 to
9,000,000; and
(c) amend the milestones of the Performance Rights as set out below.
Accordingly, the references at Sections:
(a) 5.1, 5.6 (Note 2), 5.7 (Note 1) and 9.2 to “52,500,000 Shares” are deleted and
replaced with “62,500,000 Shares”;
(b) 5.6 and 5.7 to “10,000,000 Shares held by Pure on incorporation and” are deleted;
and
(c) 2.2, 3, 5.1, 5.6, 5.7, 5,8 and 9.2 to 10,000,000 Performance Rights are deleted and
replaced with “9,000,000 Performance Rights”.
Further, Section 10.4(c) is deleted and replaced with the below:
Milestone
The Performance Rights shall vest upon the Company receiving an independent
certification of 50PJ of 2P reserves from a suitably qualified Independent Expert
pursuant to the ASX Listing Rules reported in accordance with the definitions of
Reserves, Contingent Resources and Prospective Resources and guidelines set
out in the Petroleum Resources Management System (PRMS) with respect to ATP
2051 (Project Venus) and/or ATP 927 (Project Windorah) and any form of tenure
covering the same or similar area as the original ATPs, (Milestone).
2.3 Renewal of the Venus Project
The Company confirms that it has lodged an application for the renewal of the Venus
Project (permit ATP 2051). The Company believes the permit will be renewed and it will
provide updates on the renewal process as material information is received.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
3
2.4 Use of Funds
Section 5.5 of the Prospectus is amended by the addition of the following disclosure after
the last paragraph:
“In what the Board considers to be the unlikely event that the current term of ATP 2051 is
not extended to allow the Venus Project work program to be undertaken, Eastern Gas
intends to apply funds from the Offers over the first two years following admission of the
Company to the Official List of ASX toward the work program at the Windorah Project to
be undertaken instead as follows:
ALLOCATION OF FUNDS ($) PERCENTAGE OF
FUNDS (%)
Pre-test technical evaluation and planning at the
Windorah Project
200,000 3.64%
Queenscliff 1 diagnostic fracture injection test and
fracture simulate Queenscliff 1 (Windorah Project)
3,000,000 54.55%
Technical Evaluation of the Windorah Project 300,000 5.45%
Expenses of the Offers 1 490,000 8.91%
Working capital 2 1,510,000 27.45%
Total 5,500,000 100.00
Notes:
1. Refer to Section 10.9 for further details.
2. Working Capital includes the general costs associated with the management and operation of the
Company’s business including administration expenses, management salaries, directors’ fees, rent
and other associated costs.
To the extent that:
(a) the Company’s exploration activities warrant further exploration activities; or
(b) the Company is presented with additional acquisition opportunities,
the Company’s working capital will fund such further exploration and acquisition costs (including due
diligence investigations and expert’s fees in relation to such acquisitions). Any amounts not so
expended will be applied toward administration costs for the period following the initial 2-year period
following the Company’s quotation on ASX.
2.5 Background
Section 5.1 of the Prospectus is amended by the addition of the following disclosure after
the last paragraph:
“Pure previously recorded historical costs of $46,889,000 in respect of the Projects in its
audited financial statements for the financial year ended 30 June 2025, together with a full
impairment provision of $46,889,000, resulting in a net carrying value for the Projects of $0.
While the Directors of the Company are not responsible for the accounting values used in
the financial statements of Pure, they understand that Pure’s board considers the full
impairment to have been the result of a conservative accounting treatment
recommended by Pure’s auditor only and not reflective of the underlying fair value of the
Projects.
In the Pro-Forma Financial Information in Section 6, the Directors of the Company have
adopted a fair value of $13,468,000 for the Projects and consider this assessment to be
conservative. The Directors consider that asset values should be informed primarily by
observable market data and, specifically, the trading values of comparable ASX-listed
peer companies where the market effectively sets prices on a daily basis. An alternative
valuation method is to assess the potential future cash flows of the Projects, adjusted for
development and commercialisation risk. On this basis, the Board believes that the Projects
demonstrate significant net present values, representing multiples of the carrying value
adopted in the Pro-Forma Financial Information.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
4
The Directors have conducted their own detailed assessment of the likely value of the
Projects. This assessment included reviewing valuation metrics of peer ASX-listed
companies with gas appraisal assets at a comparable stage of development and
applying peer group averages. The Directors also considered the conclusions of the
Independent Technical Report included with this Prospectus in assessing the value of the
Projects.
Further to the above, the consideration payable under the Acquisition was agreed after
discussions with the Lead Manager and after arm’s length negotiations between the
respective boards of directors of Pure and the Company. For an acquisition of such assets,
there is not always an appropriate formal valuation methodology available when
determining the purchase price payable and the Company’s board was required to take
into account qualitative factors such as those set out below in coming to a decision on
price:
• historical work undertaken on the Projects;
• the existing Contingent Resources on the Projects (refer to the Independent Technical
Report in Annexure A for further details);
• the recent significant increase in natural gas prices on Australia’s East Coast;
• the current increased demand in Australia for natural gas;
• the fact that the Windorah Project benefits from a Governmental declaration of a
‘potential commercial area’ (PCA);
• the Board’s assessment of the future prospects of the Projects including an assessment
based on the Independent Technical Report in Annexure A;
• interest from third parties in relation to the Projects; and
• comparisons of fair value of comparable gas projects.”
3. APPLICATIONS
Applications for Shares under the Offers after lodgement of this Third Supplementary
Prospectus must be made using a Supplementary Application Form attached to or
accompanying this Third Supplementary Prospectus. Applications after the date of this
Third Supplementary Prospectus must not be made on the Application Form attached to
or accompanying the Prospectus and will not be valid.
4. CONSENTS
The Company confirms that as at the date of this Third Supplementary Prospectus, each
of the parties that have been named as having consented to being named in the
Prospectus have not withdrawn that consent.
5. DIRECTORS’ AUTHORISATION
This Third Supplementary Prospectus is issued by the Company and its issue has been
authorised by a resolution of the Directors.
In accordance with Section 720 of the Corporations Act, each Director has consented to
the lodgement of this Third Supplementary Prospectus with the ASIC.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
5
A N N E X U R E 1 – F I N A NC I AL I NF O R M A T I O N S E C T I O N
6. FINANCIAL INFORMATION
6.1 Introduction
This section sets out the Pro-Forma Financial Information. The basis for preparation and
presentation of this information is also set out below.
The Pro-Forma Financial Information has been prepared by management and adopted
by the Board. The Board is responsible for the inclusion of all financial information in the
Prospectus. Pitcher Partners Sydney Corporate Finance Pty Ltd has prepared an
Investigating Accountant’s Report (IAR) in respect of the Pro-Forma Financial Information.
A copy of this report in included in Annexure C of the Prospectus.
The Pro-Forma Financial Information has, except otherwise noted, been prepared in
accordance with the recognition and measurement principles prescribed in the Australian
Accounting Standards (AAS) and the material accounting policies set out in Notes 2 and
3 below. The Pro-Forma Financial Information is presented in an abbreviated form insofar
as it does not include all the disclosures and notes required in an annual financial report
prepared in accordance with AAS and the Corporations Act.
6.2 Pro-Forma Financial Information
The Pro-Forma Financial Information set out below comprises the unaudited Pro-Forma
Statement of Financial Position as at 31 October 2025 of Eastern Gas and showing the
impact of the proposed capital raising and the acquisition of subsidiaries.
The unaudited Pro-Forma Statement of Financial Position has been derived from the
unaudited Statement of Financial Position as at 31 October 2025 of Eastern Gas adjusted
for the following transactions as if they had occurred at 31 October 2025
(Pro-Forma Transactions):
(a) Issue of 27,500,000 fully paid ordinary shares pursuant to the capital raise being
completed at $0.20 per share by Eastern Gas and the completion of the
Acquisition referred to in Section 5.1;
(b) The details of the Capital Raise are described in Section 3.2; and
(c) Total costs expected to be incurred in connection with the Capital Raise are
$490,000.
6.3 Unaudited Pro-Forma Financial Information
6.3.1 Unaudited Pro-Forma Statements of Financial Position of Eastern Gas Corporation Limited
as at 31 October 2025
BALANCE AS AT
31 OCTOBER 2025
IMPACT OF
CAPITAL RAISE
AND ACQUISITION
OF SUBSIDIARIES
$
PRO-FORMA STATEMENT
OF FINANCIAL POSITION
EASTERN GAS POST
CAPITAL RAISE MINIMUM
$5.5M (UNAUDITED)
$
Current Assets
Cash and cash equivalents - 5,500,000 5,500,000
Trade and other receivables 1 - 1
Total Current Assets 1 5,500,000 5,500,001
Non-Current Assets
Exploration and evaluation - 13,468,000 13,468,000
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
6
BALANCE AS AT
31 OCTOBER 2025
IMPACT OF
CAPITAL RAISE
AND ACQUISITION
OF SUBSIDIARIES
$
PRO-FORMA STATEMENT
OF FINANCIAL POSITION
EASTERN GAS POST
CAPITAL RAISE MINIMUM
$5.5M (UNAUDITED)
$
Total Non-Current Assets - 13,468,000 13,468,000
Total Assets 1 18,968,000 18,968,001
Current Liabilities
Trade and other payables - 490,000 490,000
Total Current Liabilities - 490,000 490,000
Non-Current Liabilities
Rehabilitation - 968,000 968,000
Total Non-Current Liabilities - 968,000 968,000
Total Liabilities - 1,458,000 1,458,000
Net Assets 1 17,510,000 17,510,001
Equity
Issued capital 1 17,317,500 17,317,501
Option reserve - 192,500 192,500
Accumulated losses - - -
Total Equity 1 17,510,000 17,510,001
6.3.2 Directors’ material assumptions in preparation of the Pro Forma Financial Information
Note 1: Reconciliation of Movements in Pro-Forma Contributed Equity
The pro-forma contributed equity includes the following assumptions:
(a) The issue of 27,500,000 Shares pursuant to a capital raising at an Offer Price of
$0.20 per Share to raise a Minimum of $5,500,000 cash before expenses of the
General Offer.
(b) Total costs expected to be incurred in connection with the Capital Raise are
approximately $490,000 settled in cash and capitalised as a cost of capital
raising. Also there are 8 million options that are expected to be issued to the lead
manager for services relating to the IPO – this has been valued at $157,619.
(c) 2 million Incentive Options are issued pursuant to the Incentive Offer to Directors
– valued at $34,881.
(d) The issue of a total of 62,500,000 Shares including 1 issued previously and 9,000,000
Performance Rights on completion of the Acquisition.
(e) The Company was incorporated on 29 October 2025. As of the balance date of
31 October 2025, the Company had not undertaken any activities other than the
issue of Shares on incorporation of the Company.
(f) The Acquisition has been assessed in accordance with Australian Accounting
Standards Board (AASB) 3 Business Combinations. Following a detailed review of
the assets, liabilities and operations of the subsidiaries, management has
determined that the subsidiaries do not constitute a business as defined under
AASB 3. Accordingly, the Acquisition has been accounted for as an asset
acquisition, not a business combination.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
7
(g) The Acquisition is a share-based payment arrangement under AASB 2 Share-
based Payments. Given the nature of the assets being in exploration stage and
contingent, the fair value of these assets cannot be determined and estimated
reliably at this stage. The fair value of the exploration and evaluation assets
acquired has therefore been determined with reference to the fair value of
equity instruments issued.
(h) Costs incurred in connection with the Capital Raise are expected to be
deductible for income tax purposes, however consistent with AAS, no deferred
tax assets have been recognised at this time as it is not considered probable that
sufficient taxable profits will be available in the foreseeable future to utilise those
deductions.
(i) Rehabilitation costs are a normal consequence of gas exploration and
extraction. In determining an appropriate level of provision, assumptions are
made as to the expected future costs to be incurred and can vary in response
to many factors. These factors include the extent of restoration required due to
changes to the relevant legal or regulatory requirements, site conditions, the
emergence of new restoration techniques, experience at other fields, and
prevailing service costs. These uncertainties may result in rehabilitation costs
differing from the amounts included in the Unaudited Pro-Forma Statements of
Financial Position.
Reconciliation of movements in pro-forma contributed equity (Minimum Subscription
$5.5M):
NUMBER OF
SHARES
#
CONTRIBUTED
EQUITY
$
Eastern Gas Historical Statement of Financial Position as at
31 October 2025
Issue of Shares on incorporation 1 1
Issue of shares pursuant to the Prospectus 27,500,000 5,500,000
Issue of shares on completion of the acquisition of the
subsidiaries
62,500,000 12,500,000
Less Offer Costs - (490,000)
Less Options issued - (192,500)
Unaudited Pro-Forma Statement of Financial Position of
Eastern Gas as at 31 October 2025
90,000,001 17,317,501
Note 2: Material Accounting Policies
A summary of material accounting policies that have been adopted in the preparation of
the Pro Forma Financial Information (set out in Sections 6.1 to 6.3), and which will be
adopted prospectively in preparation of the financial statements of the Company for the
financial year ending 30 June each year, is set out below.
The Pro Forma Financial Information has been prepared in accordance with Australian
Accounting Standards and interpretations and other authoritative pronouncements of the
AASB, and the Corporations Act.
AAS set out an accounting framework that the AASB have concluded would result in a
financial report containing relevant and reliable information about transactions, events
and conditions to which they apply.
The financial information presented in this Prospectus is presented in an abbreviated form
and does not contain all of the presentation and disclosures that are usually provided in
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
8
an annual report prepared in accordance with AAS. The Pro Forma Financial Information
have been prepared on the basis of assumptions outlined in Section 6.3.2.
All amounts disclosed in this section are presented in Australian dollars. The financial report
covers Eastern Gas Corporation Limited as an individual entity. Eastern Gas Corporation
Limited is a company limited by shares, registered, incorporated and domiciled in
Australia.
The Pro Forma Financial Information has been prepared on the basis of fair value
measurement of assets and liabilities except where otherwise stated.
(a) Use of Estimates and Judgements
The preparation of the Pro Forma Financial Information requires management to
make judgements, estimates and assumptions that affect the application of
policies and reported amounts of assets and liabilities, income and expenses.
These estimates and associated assumptions are based on historical experience
and various other factors that are believed to be reasonable under the
circumstances, the results of which form the basis of making judgements about
carrying values of assets and liabilities that are not readily apparent from other
sources.
Actual results may differ from these estimates.
The estimates and underlying assumptions are reviewed on an ongoing basis.
Revisions to accounting estimates are recognised in the period in which the
estimate is revised if the revision affects only that period, or in the period of the
revision and future periods if the revision affects both current and future periods.
Please refer to Note 1 of Section 6.3.2 for further details on the judgements,
estimates and assumptions adopted by management.
(b) Going Concern
The financial report has been prepared on a going concern basis, which
contemplates continuity of normal business activities and realisation of assets and
settlement of liabilities in the ordinary course of business.
The Directors believe the Company will be able to pay its debts as and when they
fall due and to fund anticipated activities.
(c) Income Tax
Income Tax Expense
Income tax expense is the tax payable on the company’s taxable income for the
financial year based on the applicable income tax rate adjusted by changes in
deferred tax assets and liabilities.
Deferred tax assets and liabilities
Deferred tax assets and liabilities are recognised for temporary differences at the
applicable tax rates that will apply when the assets are expected to be
recovered or liabilities are expected to be settled.
Deferred tax assets are recognised for deductible temporary differences and
unused tax losses to the extent that it is probable that future taxable profit will be
available against which the deductible temporary differences and unused tax
losses can be utilised.
(d) Cash and Cash Equivalents
Cash includes cash on hand and in all call deposits with banks or financial
institutions, investments in money market instruments maturing within less than two
months.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
9
(e) Exploration, Evaluation and Development Expenditure
Exploration, evaluation and development expenditure incurred is accumulated
in respect of each identifiable area of interest. These costs are only carried
forward to the extent that they are expected to be recouped through the
successful development of the area or where activities in the area have not yet
reached a stage that permits reasonable assessment of the existence of
economically recoverable reserves. Once an area of interest enters a
development phase, historical capitalised exploration expenditure is transferred
to capitalised development expenditure.
Where the Company acquires an area of interest (through direct purchases or
merger), expenditures incurred in the acquisition of the area of interest are
capitalised, classified as tangible or intangible, and recognised as an exploration
and evaluation asset. Exploration and evaluation assets are measured at cost at
initial recognition.
Exploration and evaluation expenditure incurred by the Company subsequent to
acquisition of the rights to explore is expensed as incurred up to the successful
completion of definitive feasibility studies or when the production commences.
Accumulated costs in relation to an abandoned area are written off in full against
profit in the year in which the decision to abandon the area is made.
When production commences, the accumulated costs for the relevant area of
interest are amortised over the life of the area according to the rate of depletion
of the economically recoverable reserves.
A regular review is undertaken of each area of interest to determine the
appropriateness of continuing to carry forward costs in relation to that area of
interest.
(f) Rehabilitation
Costs of site restoration are provided over the life of the facility from when
exploration commences and are included in the costs of that stage. Site
restoration costs include the dismantling and removal of plant, equipment and
building structures, waste removal, and rehabilitation of the site in accordance
with clauses of the oil and gas permits. Such costs have been determined using
estimates of future costs, current legal requirements and technology on an
undiscounted basis.
Any changes in the estimates for the costs are accounted for on a prospective
basis. In determining the costs of site restoration, there is uncertainty regarding
the nature and extent of the restoration due to community expectations and
future legislation. Accordingly, the costs have been determined on the basis that
the restoration will be completed within one year of abandoning the site.
(g) Options Reserve
Options issued as part of the Capital Raising are measured at fair value at grant
date, with the corresponding amount recognised within equity, net of tax effects.
(h) Issued Capital
Shares will be classified as equity. Costs directly attributable to the issue of Shares
will be recognised as a deduction from equity, net of tax effects.
6.3.3 State of affairs
The Directors of Eastern Gas are not aware of any other significant changes in the state of
affairs of the Company, or events subsequent to 31 October 2025 and up to the date of
this Prospectus, that would have a material impact on the Pro-Forma Financial Information,
except as otherwise disclosed in this Prospectus and Forecast Financial Information.
This Third Supplementary Prospectus dated 6 February 2026 is intended to be read with the replacement prospectus
dated 12 December 2025 (which replaced the original prospectus dated 5 December 2025) and the First
Supplementary Prospectus dated 16 January 2026 and the Second Supplementary Prospectus dated 23 January 2026
issued by Eastern Gas Corporation Limited (ACN 692 331 838).
10
There are significant uncertainties associated with forecasting future revenues and
expenses of the Company. In light of uncertainty as to timing and outcome of the
Company’s growth strategies and the general nature of the industry in which the